Evidence, then changes, then proof the change worked.
Conversion work has a credibility problem, and it earned it. Tests get stopped the moment they look good, lifts get claimed against a baseline nobody recorded, and the number quietly returns to where it started. What follows is how this studio avoids that, written plainly enough that you can hold us to it.
The rules we work to
- Research before changes
- Recordings, funnel data, support tickets and customer interviews come first. A backlog assembled from best practice articles is a backlog of other people's problems.
- A hypothesis, not a hunch
- Each experiment states what we expect to change, for whom, and why. Written before launch, so it cannot be rewritten afterwards to match the result.
- Sized before it starts
- Sample size and duration are calculated up front from your traffic and conversion rate. A test that cannot reach significance in a reasonable window is not run as a test.
- One primary metric
- Decided in advance. Secondary metrics are watched, but a test does not get declared a winner because something other than the primary metric moved.
- Run to the planned end
- No peeking and stopping. Checking a test repeatedly and stopping at the first good moment inflates false positives, which is how agencies produce lifts that never show up in the P&L.
- Full-week cycles
- Tests run in whole weeks. Tuesday and Saturday shoppers are different people, and a test that ends mid-week is measuring the calendar.
- Winners get rebuilt
- A variant left running inside a testing tool adds load time and breaks on the tool's next update. Winners are implemented properly in the theme and the test is turned off.
- Everything is written down
- Hypothesis, setup, result and decision for every experiment. If you leave, the log leaves with you, and your next agency does not start from zero.
An engagement, start to finish
Weeks are typical rather than promised.
- Audit, week one
- We read the store, the analytics and the recordings, and produce a ranked list of what is costing money, with the evidence for each item and a rough sense of what fixing it is worth.
- Scope, week two
- You decide what to act on. We quote it as a project or a retainer, with what is included written down and what is not written down too.
- First changes, weeks two to four
- The unambiguous fixes ship first: things that are broken, slow or confusing, where a test would only delay a change that is obviously right.
- Experiments, ongoing
- Where the answer is genuinely uncertain and traffic allows, we test. Each one gets a brief before and a readout after.
- Quarterly review
- A look back at what the work earned against what it cost. If the honest answer is 'not enough', you will hear it from us first.
01
02
03
04
05
Questions
- Why do you report tests that lost?
- Because a report containing only wins tells you nothing about whether the program works. Knowing that a change failed, and why, stops the same idea being rebuilt in six months and tells you something real about your customers.
- What if the audit says our store is fine?
- Then it says that. It happens, usually when the real constraint is acquisition cost or margin rather than the storefront. We would rather tell you that than sell you a conversion program that cannot help.
- How long before we see anything?
- The audit lands in about a week. First changes usually ship within two to three weeks of starting work. A test that needs to reach significance then takes as long as the maths says, commonly two to six weeks.
Get the teardowns
A new store teardown when we publish one: what was broken, what changed, what it did. No sequence, no pitch.
The audit is the first step
It follows the same rules as everything above, and it is free, so it is a fair way to find out whether this is how you want your store worked on.